IFC Gap Fulfilment (ESIA–LARAP Study) for the Pomalaa High Pressure Acid Leach (HPAL) Nickel Project
- Client
- PT Vale Indonesia Tbk
- Location
- Southeast Sulawesi, Indonesia
- Status
- Completed
- Period
- 2022
This consultancy supports the Pomalaa High Pressure Acid Leach (HPAL) Nickel Project by conducting an IFC Gap Fulfilment Study focused on environmental and social safeguards. The work involves a comprehensive review and update of the Environmental and Social Impact Assessment (ESIA) and Land Acquisition and Resettlement Action Plan (LARAP) to ensure full compliance with the IFC Performance Standards, the Equator Principles, and Indonesia’s environmental and social regulations.
The assignment includes field verification, socio-economic and stakeholder consultations, environmental baseline assessment, gap analysis between existing studies and IFC requirements, and preparation of corrective action plans. The project aims to strengthen the safeguard framework of PT Vale Indonesia’s nickel development operations, ensuring responsible land acquisition, transparent community engagement, and sustainable environmental management throughout the project lifecycle.
By aligning project documentation and practices with international sustainability standards, this study contributes to the environmental and social due diligence required for international financing and reinforces PT Vale Indonesia’s commitment to ethical, transparent, and sustainable mining operations.
Capabilities this work demonstrates
Related projects
ESIA Update of Ulumbu & Mataloko Geothermal Power Plant Exploration and its Associated Facilities
2026 · PT Connusa Energindo - PT PLN (Persero) as Project Beneficiary · Indonesia
Refinement of ESIA & ESMP for Sustainable Aviation Fuel (SAF) NS-1 Project
2025 · PT Tripatra Engineers and Constructors · Indonesia
Inhouse ESIA Training for PT PLN Nusantara Power
2025 · PT PLN Nusantara Power · Indonesia
Interested in a Similar Project?
Talk with our experts about solutions tailored to your project.