Due Diligence and LARAP Preparation for the Pomalaa High Pressure Acid Leach (HPAL) Nickel Project – International Finance Corporation (IFC)
- Client
- PT Vale New Zealand (supported by International Finance Corporation – IFC)
- Location
- Southeast Sulawesi, Indonesia
- Status
- Completed
- Period
- 2022
This consultancy provides social safeguard due diligence and LARAP preparation services for the Pomalaa HPAL Nickel Project, a strategic nickel processing initiative developed by PT Vale in Southeast Sulawesi. The assignment is carried out in alignment with IFC Performance Standards, Equator Principles, and Indonesian regulatory frameworks governing land acquisition and resettlement.
The study involves verifying land acquisition processes, identifying project-affected persons and assets, assessing livelihood impacts, and preparing the Land Acquisition and Resettlement Action Plan (LARAP) consistent with IFC requirements. Additionally, it includes stakeholder consultations, grievance redress mechanism (GRM) development, and the formulation of corrective action plans to bridge gaps between national procedures and international best practice.
Through this due diligence process, the project ensures that land acquisition and resettlement activities for the Pomalaa HPAL facility are conducted transparently, equitably, and in compliance with international sustainability and human rights standards — thereby supporting ethical project financing and long-term social sustainability.
Capabilities this work demonstrates
Related projects
Environmental and Social Impact Assessment (ESIA) and supplementary studies in accordance with the international standards (Equator Principles and IFC Performance Standards)
2025 · PT Indonesia Huali Industry Park (IHIP) and PT Huali Nickel Indonesia (HNI) · Indonesia
Consultancy Services on Land Acquisition and Livelihood Restoration Plan (LALRP) Study for the Mentarang Induk Hydroelectric Project – Overhead Transmission Line
2024 · PT Kayan Hydropower Nusantara – a joint venture of Alamtri (Adaro Group), Sarawak Energy Berhad, and KPP Group · Indonesia
Consultancy Services on Land Acquisition and Resettlement Action Plan (LARAP) Phase II — Mentarang Induk Hydroelectric Project (MIHEP)
2023 · PT Kayan Hydropower Nusantara — a joint-venture between Alamtri Resources Indonesia/Adaro, Sarawak Energy Berhad, and KPP Group · Indonesia
Interested in a Similar Project?
Talk with our experts about solutions tailored to your project.