Consultancy Services on Land Acquisition and Livelihood Restoration Plan (LALRP) Study for the Mentarang Induk Hydroelectric Project – Overhead Transmission Line
- Client
- PT Kayan Hydropower Nusantara – a joint venture of Alamtri (Adaro Group), Sarawak Energy Berhad, and KPP Group
- Location
- North Kalimantan, Indonesia
- Status
- Ongoing
- Period
- 2024 — Present
As part of the development of the Mentarang Induk Hydroelectric Project (MIHEP) and its 500 kV overhead transmission line, this consultancy provides an independent Land Acquisition and Livelihood Restoration Plan (LALRP) Study to ensure that land acquisition and social safeguard processes are implemented in a transparent, equitable, and sustainable manner.
The assignment covers a comprehensive assessment of land acquisition impacts and socio-economic conditions of affected communities, validation of the Detailed Measurement Survey (DMS) and Inventory of Losses (IOL), formulation of livelihood restoration strategies, and development of frameworks for grievance redress, stakeholder engagement, and social monitoring. It also integrates aspects of Cultural Heritage Management (CHMP) and Indigenous Peoples Planning (IPP) to ensure full compliance with Indonesian regulations and international best-practice safeguard standards for hydropower infrastructure.
Deliverables include the preparation of the LALRP document, implementation roadmap, and recommendations to guide the client in executing land acquisition and restoration programs in alignment with both national requirements and international expectations for responsible and socially inclusive project development.
Through evidence-based analysis and field engagement, the study supports PT Kayan Hydropower Nusantara in realizing the MIHEP’s vision as a strategic national project (PSN) that delivers renewable energy while upholding social responsibility and sustainable community development in North Kalimantan.
Capabilities this work demonstrates
Related projects
Environmental and Social Impact Assessment (ESIA) and supplementary studies in accordance with the international standards (Equator Principles and IFC Performance Standards)
2025 · PT Indonesia Huali Industry Park (IHIP) and PT Huali Nickel Indonesia (HNI) · Indonesia
Consultancy Services on Land Acquisition and Resettlement Action Plan (LARAP) Phase II — Mentarang Induk Hydroelectric Project (MIHEP)
2023 · PT Kayan Hydropower Nusantara — a joint-venture between Alamtri Resources Indonesia/Adaro, Sarawak Energy Berhad, and KPP Group · Indonesia
Consultancy Services for the Preparation of LARAP Study and Land Acquisition Planning Documents – Matenggeng Pumped Storage 943 MW
2023 · Universitas Gadjah Mada (UGM) - PT PLN (Persero) - Central Java Development Unit (UIP JBT) · Indonesia
Interested in a Similar Project?
Talk with our experts about solutions tailored to your project.